Skip to content
County Rd Studios after renovation
Back to Projects

Renovation Project

County Rd Studios

Renovating a large mid terrace property.

The story of Studio B

Studio B finished: open plan living spaceStudio B during renovation, walls removedBeforeAfter

Before

During renovation. Walls were removed. Damp proof updated. Sound insulation added to walls and ceilings.

After

Open plan living space after renovation.

Behind the finish

It’s the things you don’t see that make the difference.

The work behind every wall and ceiling is what makes our homes quieter, drier and fresher to live in.

  • Quieter
  • Drier
  • Fresher
  • Ceilings. We add an extra layer of insulation and fire protection overhead, battening the existing ceiling and lining it with fireboard and acoustic plasterboard on top of what’s already there.

  • Walls. We damp-proof all the way round, and on some walls we fit battens and fresh plasterboard set away from the original wall, for a lovely dry, fresh living environment.

Kitchen and dining with additional worktop bar to provide subtle separation.
Studio B kitchen and dining area with a worktop bar
The old cupboard under the stairs, stripped backBefore
This old cupboard space under the stairs...
The same space as extra kitchen worktop and storageAfter
Was transformed into additional kitchen space.
The cluttered outside space before the extensionBefore
An extension was built to convert this outside space into a bathroom.
The new bathroom built in the extensionAfter

01Studio B Renovation

10 photos

02Studio C Renovation

11 photos